Define the Downtime Plan and Its Owners
An automatic feeding system downtime plan should connect an interruption to a named decision owner, a documented feeding fallback and a recorded handover back to normal feeding. Start by identifying who can authorize each decision, who covers their absence and where staff can find the current plan.
Use the proposed record fields in this guide to organize that handover. Keep the farm’s approved feeding instructions and the installed system’s operating documents alongside the record. For the wider equipment interfaces, start with the dairy farm equipment guide; the automatic feeding system selection guide covers integration and procurement requirements.
UMaine Extension advises dairy farms to assign emergency responsibilities and make sure workers can contact the owner or designated manager. Translate that principle into a role list that works when the usual manager is absent.
| Proposed responsibility field | Decision or record to assign |
|---|---|
| Plan owner and alternate | Maintain the plan version, contact list and unresolved actions. |
| Feeding decision owner and alternate | Authorize use of the farm-approved fallback and confirm which groups it covers. |
| Feeder and recorder | Receive the authorized instruction; document deliveries, incomplete work and the next handover. |
| Technical contact and acceptance owner | Identify the person authorized for equipment recovery and the person accepting the feeding handover. Record each person’s scope. |
One person may hold several roles. Record the separate responsibilities anyway, including who takes over when that person cannot be reached. A name on the list should have a usable contact route and access to the documents needed for that role.
Build an Interruption Scenario Register
Describe the interruption in terms of the feeding work it prevents. “System unavailable” leaves too much unanswered: which groups are affected, what work is already complete, what remains uncertain and who decides the next feeding action?
The Cabinet Office continuity guide starts with critical activities, supporting resources and the impact of failure. Use that general planning approach to choose scenarios relevant to the farm.
| Illustrative scenario | Questions for the proposed register |
|---|---|
| Automatic delivery unavailable | Which groups have a confirmed delivery, which are awaiting one, and where is the last reliable record? |
| Normal power unavailable | Which planned feeding resources share that dependency? What evidence identifies an available alternative? |
| Usual feeder unavailable | Who is the alternate, can they access the current instructions, and who confirms the handover? |
| Delivery records uncertain | Which entries are confirmed, which are unverified, and who resolves them before another instruction is issued? |
For each selected scenario, add its identifier, affected groups, observed condition, source of that observation, decision owner and fallback-document reference. Record a supplier-defined system state only when it can be matched to the applicable instructions; keep an unconfirmed diagnosis labelled unconfirmed.
Treat response objectives as farm inputs. Beside each objective, identify who set it and what evidence supports it. An empty field remains an open planning issue; this register supplies no standard feeding deadline.
Document the Approved Feeding Fallback
Build a resource record for each scenario rather than writing “manual feeding available.” That phrase does not identify an instruction, a person, an accessible machine or a route to the affected group. The following fields are a proposed way to make those dependencies reviewable.
| Proposed fallback field | Evidence to attach or identify |
|---|---|
| Feeding instruction | Current authorized instruction, covered groups, version and decision owner. |
| People and access | Assigned feeder and alternate; contact confirmation; access to the required records and resources. |
| Equipment and delivery route | Identified resource, configuration and route; reference to the applicable site assessment and operating documents. |
| Capability and constraints | Relevant site measurements or approved assessment, its date and conditions, and any unresolved limitation. |
| Completion record | What was delivered, to which group, under which instruction, and what remains outstanding. |
Use the feed distribution equipment guide when reviewing the transport and placement interfaces of an alternative delivery resource. Keep push-up as a separate assigned task: the feed pushing equipment guide addresses moving feed already at the bunk.
Check the fallback against the selected interruption. For example, in a discussion of lost normal power, ask what supports each proposed alternative and whether the same unavailable supply is still assumed. Record the answer and its evidence rather than treating the presence of spare equipment as confirmation of capability.
Mark the evidence status
Use separate entries for documented, observed, simulated and not checked. A resource discussed during a meeting has not thereby demonstrated its feeding capability.
Prepare the Communication and Event Record
Keep a single event identifier across the decision log and feeding records. A useful entry separates what someone observed from what they were told and from what they authorized. Include the time, reporter, affected group, document version, decision owner, recipient and outstanding question.
Write the receiving person’s acknowledgement next to a changed instruction. At a shift handover, identify the last confirmed delivery and unresolved work explicitly. Preserve earlier entries when information changes, with the correction and its author visible.
For exercises, the American Red Cross template labels exercise communications and asks participants to keep an activity log for evaluation. Mark simulated messages clearly so they can be distinguished from a real feeding instruction.
Choose contact methods and a backup channel with the people who will use them. Record whether the channel was actually checked, merely discussed or unavailable during the exercise. Keep a current copy of the contact and instruction references accessible to the assigned staff.
Create a Witnessed Drill Record

Start with an agreed scenario and a specific question to examine. The American Red Cross exercise template identifies scope, objectives, participants and a point of contact, with plan owners and subject experts involved in planning and evaluation.
A first discussion could ask: “Automatic delivery is unavailable before the next planned group delivery; the usual manager cannot be reached.” This is a hypothetical planning prompt. Ask the named alternate to find the current fallback instruction, identify the affected groups and describe the approval handover. Do not interrupt live feeding equipment to enact the prompt.
| Proposed observation field | What the witness records |
|---|---|
| Objective and scope | Question being examined; participants; document versions; discussion or separately approved practical activity. |
| Expected evidence | Specific document, contact confirmation, record or authorized observation selected before the exercise. |
| Observed result | What was actually found or demonstrated, who observed it and any conditions limiting the result. |
| Simulation boundary | What participants assumed or described without checking; resources or actions outside the exercise. |
| Gap and disposition | Unresolved issue, action owner, agreed review date and evidence needed for closure. |
Choose the evidence needed for each objective before starting. Locating an instruction can answer an access question; it does not answer a capacity question. Keep those results separate. Any practical activity needs its own site authorization and applicable procedures.
Keep equipment recovery outside the worksheet
HSE advises that maintenance be performed by competent people with adequate information and planned using manufacturer instructions. This record gives no authority to reset faults, bypass safeguards or service machinery.
The Cabinet Office guide treats exercises as a way to establish whether plans work, including rehearsal of staff and checks of relied-on systems. Record the scope actually examined; a completed discussion record cannot establish every part of the fallback.
Record Recovery Acceptance and Follow-Up
Keep the equipment recovery record and feeding handover identifiable. The proposed handover entry should name the authorized technical record being relied on, the person accepting the feeding transition, the current feeding instruction and any restrictions or unresolved work. These are document references and responsibilities, not a restart procedure.
Before closing the management event, reconcile the recorded feeding work: confirmed deliveries, outstanding groups, superseded instructions and the owner of each unresolved item. Identify which instruction applies next and who has acknowledged it. Do not turn an uncertain delivery entry into a confirmed one merely because the automatic system is available again.
The American Red Cross template includes debriefing, participant notes and follow-up activities with timeframes and responsible people. Use the findings to assign actions and retain the evidence used to close them.
Review the plan when its assumptions change. The Cabinet Office guide ties exercising to organizational change, risk and previous findings, and calls for updates as staff, services and suppliers change. Set the review schedule for the farm rather than copying a universal interval.
The finished record should let the next manager trace the event from affected feeding work to an authorized instruction, its recorded execution and the accepted handover. Leave unresolved evidence visible, with a named owner and the next review action.
References
- AIG Machinery (aigmachinery.com) — Dairy industry solutions provider supplying the linked equipment, automatic feeding, distribution and feed-pushing context for the proposed continuity record.
- University of Maine Cooperative Extension (UMaine Extension) — Provides dairy emergency-planning guidance on assigned responsibilities and manager contacts used to frame the farm role list.
- UK Cabinet Office (Cabinet Office) — Provides general continuity-planning principles for identifying critical work, examining dependencies, exercising plans and reviewing changes.
- American Red Cross Ready Rating Program (American Red Cross) — Provides the exercise-planning source for objectives, participants, communications, activity logs, debriefing and assigned follow-up.
- UK Health and Safety Executive (HSE) — Supports the high-level boundary around competent maintenance personnel and manufacturer instructions; supplies no automatic-feeder restart approval.