Dairy Feeding Equipment Solutions
A useful equipment inquiry starts with the ration, working batch range, loading method, site and required workflow. Final availability, dimensions, capacity, power, configuration and performance conditions must be confirmed in current model documentation and a written quotation.
Equipment categories
TMR Mixers
Stationary, trailed, vertical and horizontal configurations may be discussed. Selection depends on the working batch range, ration characteristics, loading, power, travel route and discharge requirements.
Feed Distribution Equipment
Feed spreaders and distribution equipment move prepared feed along a defined route. Specify payload, deliveries, fill method, route dimensions, discharge, power, cleaning and emergency method.
Feed Pushers and Feeding Robots
A feed pusher moves existing feed closer to the bunk. Confirm bunk geometry, feed condition, route obstacles, navigation, charging, schedule, safety response, cleaning and fallback.
Automatic Feeding Systems
An automatic feeding project may connect storage, dosing, weighing, processing, mixing, transport, distribution and controls. The project boundary must state the included functions and interfaces.
Information required for a relevant proposal
| Input | Project information |
|---|---|
| Country and site location | |
| Feeding groups | |
| As-fed amount per group per day | |
| Deliveries per group per day | |
| Smallest and largest batch | |
| Forage and other ingredient forms | |
| Current feeding equipment | |
| Available tractor, power and utilities | |
| Storage and loading arrangement | |
| Route and building dimensions | |
| Required discharge | |
| Automation boundary | |
| Expansion plan and timeline |
Quotation requirements
- Exact model and configuration.
- Assumptions taken from the inquiry.
- Working batch range and material limitations.
- Power, utilities and site requirements.
- Included equipment and controls.
- Freight, installation and commissioning responsibility.
- Farm-supplied work and exclusions.
- Documentation, training and acceptance tests.
- Recommended spare parts and service arrangement.
- Warranty scope and current delivery estimate.
Important specification notice
Website values can become outdated or may apply only to one configuration. Use the written quotation and current model documentation for the final purchase decision. Do not rely on a generic volume, speed, range, charging time, battery life, accuracy or production claim without the exact model and stated test conditions.
Prepare before requesting a quote
Send the completed project inputs through the Contact page.
